The total-play System installation follows strict Quality Assurance procedures.
DesignEach total-play design takes into account site-specific characteristics, the client's needs and are all generated in accordance with Performance Quality Standards (PQS) and the ECB TS6 "Technical Requirements and Performance Specification for Non-Turf Cricket pitches 'The Standard"The submitted design, depending on specific requirements, will include the following:
BuildAt every stage of the build total-play’s 'Quality Assurance Process' ensures that fundamental parts of the project are assessed to ensure high standards are kept. This involves on site testing of each component.Using the Performance Quality Standards (PQS) stated testing procedure each stage is approved using the following:
A copy of the total-play 'Quality Assurance Process' and other documentation outlining our services are available on request. Please see product information page for more information. |